Construction Piling
SR Global construction piling rigs such as the CPD-15 drill accurate pile holes for building foundations, bridges, metro and infrastructure projects. DTH drilling gives fast progress through rock and boulders, and the rigs can be mounted on an 8×4 truck, crawler or skid. Pair them with our cluster hammers (800–1200 mm) for large-diameter piles.